3. Installation

3.1 Site Preparation

1. The recommended mounting position is vertical wall mount.
2. Mount the Inverter/Charger on a solid vertical surface made of non-flammable construction materials.
3.2 Inverter Installation (Single and Parallel Modes)
1. See section 1.3 Package Contents to ensure all necessary parts are available for the Inverter/Charger installation and
operation.
2. Mark the mounting location(s) where the Inverter/Charger will be installed.
3. Install the Inverter/Charger at a height that allows easy visibility of the LCD at all times.
4. For proper air circulation and heat dissipation, make sure there is a minimum of 20 cm distance on each side and 50
cm distance from bottom of the unit (see Figure 3.2A).
5. In single-phase and 3-phase parallel modes, mount each inverter at least 20 cm apart (see Figure 3.2B).
6. The ambient temperature should be between 0°C and 50°C to ensure optimal operation.
7. Make sure to provide sufficient space as shown in Figure 3.2A and Figure 3.2B to guarantee sufficient heat dissipation
and provide adequate space for proper clearance of wiring and communication connections.
8. Secure the Strain Relief bracket to the APS using two (2) included mounting screws below the AC Output wiring pass-
through. After the AC wiring is installed, secure wiring with the included zip ties.
20 cm
50 cm
Figure 3.2A
20 cm
50 cm
Figure 3.2B
11
20 cm
20 cm