4. Installation

4.1 Pre-Installation terms and conditions

For a trouble-free installation of the ordered TIP900 system and associated components, several pre-
installation tasks have to be performed and guaranteed:
Definition and clearance of the location for the operators Industrial Touch Panel PC
Free access to cable trays and power supply (110 – 240VAC, 50/60Hz)
o
o
Unobstructed and danger free cable inlet (power, network, control wires)
o
Determination of all cable lengths to associated terminals
o
Lead in and connect the network, power supply and control cables either direct into the
Touch Panel PC case or through an optional pedestal / support shaft
Definition and clearance of the location for the Protective Thermal Imager housing
Free access to cable trays and power supply (110 – 240VAC, 50/60Hz)
o
o
Unobstructed and danger free cable inlet (power, network, control wires)
o
Determination of all cable lengths to associated terminals. If network cable length
exceeds 80m (262 ft.), then fiber optic option needs to be considered and ordered
o
Determination of max. scan width (inner conveyance belt width) for dried wallboards
o
Definition, production and installation of a vibration free mounting frame to adapt the
Protective Housing in a specific height and centered over the conveyance belt.
For details, see chapter 4.3.1 and 4.3.2.
o
Installation of the protective housing and associated equipment:
Definition and clearance of the locations for the Temperature Compensation Set
o
Free access to cable route to associated terminals
o
Unobstructed and danger free cable inlet (power, network, control wires)
o
Production and installation of mounting accessories (brackets, cable fixation)
o
Installation of the Temperature Compensation Set:
TIP900
Mounting the Protective Thermal Imager housing, centered over the
conveyance belt, to the mounting frame. The installation height of lower
housing edge above wallboard surface is about ½(half) of inner conveyance
belt width. See Figure 24 for more details.
Integration of the separately shipped Thermal Imager in the housing
Lead in and connect the network, power supply and control cables
Mounting the telescope arm with integrated Compact Temperature Sensor
close to kiln discharge at a convenient position
Mounting the counter telescope arm (black paddle) in near distance to the
telescope arm with Compact Temperature Sensor, close to kiln discharge
Mounting the Compact Temperature Sensor Communication Box in a
convenient position and connect the Compact Temperature Sensor cable. Be
aware, that the supplied cable length of the Compact Temperature Sensor
Head is 15m(49ft)
Install the cabling for power supply and network between the Communication
Box and the Thermal Imager cabinet.