6.4.9 Battery Test

NOTE 1
NOTE 2
72
Eaton 93E MK2 UPS (10-40kVA, 380/400/415V) Installation and Operation
This UPS has a user initiated battery test intended to determine if the batteries are
able to support the load.
The battery test is only able to be initiated when the battery is fully charged. This
normally occurs within 72 hours of the start of a charging cycle. The command will
not be shown if the test is not able to be run.