3
|
About the box
3.3 Indoor unit
3.3.1 To unpack the indoor unit
3.3.2 To remove the accessories from the indoor unit
3.3.3 To handle the indoor unit
Installer reference guide
20
1
a
4×
c
1×
a Shut-off valves for water circuit
b Overpressure bypass valve
c General safety precautions
d Addendum book for optional equipment
e Indoor unit installation manual
f Operation manual
g Sealing rings for shut-off valves (space heating water circuit)
h Sealing rings for field-supplied shut-off valves (domestic hot water circuit)
i Sealing tape for low voltage wiring intake
Use the handles at the back and at the bottom to carry the unit.
a Handles at the back of the unit
b Handles at the bottom of the unit. Carefully tilt the unit to the back so that the
handles become visible.
2
8×
b
1×
d
e
f
g
1×
1×
1×
8×
a
a
b
b
EPRA14~18DAV3+W1 + ETVH/X16S18+23DA6V+9W(G)
h
i
4×
1×
Daikin Altherma 3 H HT F
4P587502-1B – 2020.12