INSTALLATION INSTRUCTIONS
Powering up the Unit (cont.)
IMPORTANT:
elevations, reduce the default operating
temperature (200°F/92°C) by 2°F/1°C for each
1000 feet (300 m) of elevation above 4000 feet
(1200 m). See PROGRAMMING GUIDE.
16
volume, the heating elements will turn on automatically.
Depending on the incoming water temperature and
requires 20 to 30 minutes to reach the factory set
"Ready to Brew" should be on the display.
17
hot water through the hot water faucet to help purge air
from the tubing inside the brewer.
18 Brew a cycle of at least 12 ounces, to purge any
remaining air from the tubing. See OPERATING
INSTRUCTIONS. During the initial brew cycle and
water tank.
II11
071018C