Site Preparation Requirements; Documentation; Conventions - Agilent Technologies 55B AA User Manual

Hide thumbs Also See for 55B AA:
Table of Contents

Advertisement

Introduction

Site Preparation Requirements

Prior to receiving your instrument you will have been provided with
an Agilent AA Systems Site Preparation Guide, which describes the
environmental and operating requirements of the Agilent AA system.
You must prepare your laboratory according to these instructions
before the Agilent AA can be installed. You should keep the Site
Preparation Guide for future reference. If you have misplaced your
copy, you can obtain a replacement from your local Agilent office.

Documentation

This manual covers the setup and operation of the basic Agilent AA
system only. Operating instructions for the Sample Introduction
Pump System (SIPS) and other AA accessories are given in the
manuals accompanying those accessories.
If you are controlling the instrument with an external PC and SpectrAA software
NOTE
refer to the documentation and Help provided with the SpectrAA software.

Conventions

The following conventions have been used throughout this manual:
Single quotes (' ') indicate menu options and field names (e.g., select
the 'Cookbook' option).
Bold text indicates the Keypad keys on your Agilent AA instrument
(e.g., press the Read key).
ALL CAPITALS indicates text you must type in from the keyboard
(attached to an external PC).
32
Agilent 55B AA Spectrometer User's Guide

Advertisement

Table of Contents
loading

Table of Contents