Pressure Relief Procedure - Graco Gusmer Reactor H-25 Operation

Hydraulic, heated, plural component proportioner
Table of Contents

Advertisement

Pressure Relief Procedure

1.
Relieve pressure in gun and perform gun shut-
down procedure. See gun manual.
2.
Close gun fluid manifold valves A and B.
3.
Shut off feed pumps and agitator, if used.
4.
Turn PRESSURE RELIEF/SPRAY valves (SA,
SB) to PRESSURE RELIEF. Route fluid to waste
containers or supply tanks. Ensure gauges drop
to 0.
SA
311299C
ti2421a
SB
ti7740a
5.
Engage gun piston safety lock.
6.
Disconnect gun air line and remove gun fluid
manifold.
Pressure Relief Procedure
ti2409a
ti2554a
29

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gusmer reactor h-xp2

Table of Contents