Graco Gusmer Reactor H-25 Operation page 19

Hydraulic, heated, plural component proportioner
Table of Contents

Advertisement

6.
Install Fluid Temperature
Sensor (FTS)
The Fluid Temperature Sensor (FTS) is supplied. Install
FTS between main hose and whip hose. See Heated
Hose manual 309572 for instructions.
7.
Connect heated hose
See 309572 for detailed instructions for Graco
heated hoses.
CAUTION
The fluid temperature sensor (C) and whip hose (D)
must be used with heated hose, see page 19. Hose
length, including whip hose, must be 60 ft (18.3 m)
minimum.
a.
Turn main power OFF
b.
Assemble heated hose sections, FTS,
and whip hose.
c.
Connect A and B hoses to A and B out-
lets on Reactor fluid manifold (FM).
Hoses are color coded: red for compo-
nent A (ISO), blue for component B
(RES). Fittings are sized to prevent con-
nection errors.
FM
N
A
311299C
Manifold hose adapters (N, P) allow use of 1/4 in.
and 3/8 in. ID fluid hoses. To use 1/2 in. (13 mm) ID
fluid hoses, remove adapters from fluid manifold
and install as needed to connect whip hose.
d.
Y
8.
Close gun fluid manifold
.
valves A and B
9.
Connect whip hose to gun
fluid manifold
Do not connect manifold to gun.
P
B
ti9878a
Connect cables (Y). Connect electrical
connectors (V). Secure with plastic ties.
Be sure cables have slack when hose
bends. Wrap cable and electrical con-
nections with electrical tape.
Setup
V
ti2727a
ti2411a
ti2417a
19

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gusmer reactor h-xp2

Table of Contents