Graco Gusmer Reactor H-25 Operation page 20

Hydraulic, heated, plural component proportioner
Table of Contents

Advertisement

10. Pressure check hose
See hose manual. Pressure check for leaks. If
no leaks, wrap hose and electrical connections
to protect from damage.
11. Set transformer wire taps
Turn main power switch OFF
tap connections vary depending on length of heated
hose. See F
. 6 or F
. 7. Verify that wire taps are cor-
IG
IG
rect.
100 ft
50 ft
.
Hose Length* ft (m)
60-85 (18.3-25.9)
110-135 (33.5-41.2)
160-185 (48.8-56.4)
210-235 (64.1-71.7)
* Length includes heated fluid hose and whip hose.
F
. 6: Transformer Wire Taps, Units with Part No.
IG
15B351 Transformer
20
. Transformer wire
150 ft
200 ft
ti3469a
Tap Terminal
Label (ft)
50
100
150
200
100 ft
150 ft
50 ft
.
Hose Length* ft (m)
60-85 (18.3-25.9)
110-135 (33.5-41.2)
160-185 (48.8-56.4)
210-235 (64.1-71.7)
260-285 (79.3-86.9)
310 (94.6)
* Length includes heated fluid hose and whip hose.
F
. 7: Transformer Wire Taps, Units with Part No.
IG
15B352 Transformer
Setup
200 ft
250 ft
300 ft
ti3469a
Tap Terminal
Label (ft)
50
100
150
200
250
300
311299C

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gusmer reactor h-xp2

Table of Contents