FAA71+100BUV1B
Sky Air indoor units
ESIE22-01 – 2022.02
c
A
e
A FAA71B unit
a Wiring terminal X2M
b Wiring terminal X1M
c Screw (cover)
d Cover
e Screw (ground wire)
f Indoor unit main PCB
g Screw (switch box)
h Switch box
A
A FAA100B unit
a Wiring terminal X2M
b Wiring terminal X1M
c Screw (cover)
d Cover
e Screw (ground wire)
f Indoor unit main PCB
g Screw (switch box)
h Switch box
2 Route the connectors of the indoor unit fan motor and swing flap motor(s)
inside the switch box and connect them to the indoor unit main PCB.
3 Install and tighten the screw to secure the switch box.
4 Install the 2 heat exchangers thermistor in their holder.
5 Attach the wiring harnesses to the switch box as needed.
6 Connect the ground wire to the heat exchanger using the screw.
7 Install the cover. Install and tighten the screw to fix the cover.
8 Connect the power supply wiring to the wiring terminal X2M.
d
f
h
g
c
d
f
h
e
g
4
Components
|
a
b
a
b
Service manual
65