Daikin SkyAir RZR-P Series Service Manual page 75

Cooling only / heat pump r-410a 60hz
Hide thumbs Also See for SkyAir RZR-P Series:
Table of Contents

Advertisement

SiUS281117
1.1.4 Confirmation on Normal Operation
 Conduct normal unit operation after the check operation has been completed.
 Confirm that the indoor/outdoor units can be operated normally.
 Operate indoor unit one by one to check that the corresponding outdoor unit operates.
 Confirm that the indoor unit discharges cold air (or warm air).
 Operate the air direction control button and airflow rate control button to check the function
68
(When outdoor air temperature is 82°FDB or higher, the unit can not be operated with
heating mode. See the installation manual attached.)
(When an abnormal noise due to liquid compression by the compressor can be heard, stop
the unit immediately, and then on the crankcase heater to heat up it sufficiently, then start
operation again.)
of the devices.
Test Operation
Field Setting

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents