Defrosting Operation - Daikin SkyAir RZR-P Series Service Manual

Cooling only / heat pump r-410a 60hz
Hide thumbs Also See for SkyAir RZR-P Series:
Table of Contents

Advertisement

SiUS281117
3.3

Defrosting Operation

Pc: High-pressure sensor detection value
Pe: Low-pressure sensor detection value
Tc: High-pressure equivalent saturation temperature
Te: Suction pipe equivalent saturation temperature
The defrost operation is performed to solve frost on the outdoor unit heat exchanger when
heating, and the heating capacity is recovered.
[Conditions to start]
The defrost operation is started referring following conditions.
 Outdoor unit heat exchanger heat transfer co-efficiency
 Temperature of heat exchanger (Tb)
 Timer (2 hours at the minimum)
Parts Name Symbol
RZR18/24/32P
RZQ18/24/30P
Compressor
M1C
(INV.)
Outdoor unit
M1F
fan
Four-way
20S1
Y1S
valve
Electronic
expansion
EV1
Y1E
valve (Main)
Solenoid
valve (Hot
SVP
Y2S
gas)
Solenoid
valve
(Receiver
SVG
Y3S
gas
discharging)
Ending conditions
 From the preparing operation to the defrost operation, and from the defrost operation to the
operation after defrost, the compressor stops for 1 minute to reduce noise on changing of the
four-way valve.
Fan
Electronic expansion valve
40
In addition, outdoor unit heat exchanger co-efficiency is derived from Tc, Te, and the
compressor load.
Electric Symbol
RZR36/42P
RZQ36/42P
M1C
M1F
M2F
Y1S
Y1E
Y2S
Indoor unit actuator
Thermostat ON unit
Stopping unit
Thermostat OFF unit
Thermostat ON unit
Stopping unit
Thermostat OFF unit
Defrost preparation
Defrost operation
operation
52 Hz
177 Hz
STEP 8
OFF
ON
OFF
SH control
1400 pls
OFF
ON
ON
ON
130 seconds
OR
Special Control
Post Defrost
operation
2-step increase from
52 Hz to (Pc – Pe >
58 psi) every 20
seconds
STEP 8
ON
200~400 pls
ON
OFF
 15 minutes
 160 seconds
OR
 Tb > 51.8F
 Pc – Pe > 58 psi
During defrost
OFF
OFF
OFF
500 pls
500 pls
500 pls
Function and Control

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents