Rigging - Trane Horizon OABD Series Installation, Operation And Maintenance Manual

Outdoor air unit
Table of Contents

Advertisement

Figure 104. Rigging and center-of-gravity data
SPREADER BARS
LENGTH
WIDTH
Before proceeding, refer to tables in Unit Weight section for
typical unit operating weights and
drawing.
1. Remove the shipping crate from around the unit.
2. Rig the unit as shown in
adequate strength lifting slings to all four lifting brackets in
the unit base rail. Do not use cables, chains, or slings
except as shown.
3. Install a lifting bar, as shown in
the unit and to facilitate a uniform lift. The minimum
distance between the lifting hook and the top of the unit
should be 7 feet.
4. Test-lift the unit to ensure it is properly rigged and
balanced, make any necessary rigging adjustments.
5. Lift the unit and position it into place. Remove fork pockets
prior to setting on the curb.
6. Downflow units; align the base rail of the unit with the curb
rail while lowering the unit onto the curb. Make sure that the
gasket on the curb is not damaged while positioning the
unit.
OAU-SVX007A-EN
8-point lift,
horizontal
return with
energy wheel
LIFTING POINTS
(8 LOCATIONS)
DETAIL A
SCALE 1 : 12
Figure 104, p. 66
for rigging
Figure 104, p.
66. Attach
Figure 104, p.
66, to protect

Rigging

Figure 105. Rigging and center-of-gravity data
Unit Weight and Rigging
4-point lift
Model: OAB
6-point lift
Model: OAB
67

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents