Connecting The Power Cord; Table 3 Power Cord Requirements - Nortel 600 Installing

Hide thumbs Also See for 600:
Table of Contents

Advertisement

24 Chapter 2 Cabling the gateway and turning the power on

Connecting the power cord

You must order the power cord for the Contivity 600 separately.
The power cord must meet the requirements described in

Table 3 Power cord requirements

Requirement
Current rating
Certification
Cord length and flexibility The power cord must be less than 4.5 meters (14.7 feet) long.
Power supply connector
Wall outlet connector
To connect the power cord and turn on the system power:
1
Plug the cable attached to the external power pack into the receptacle labeled
"DC Input" on the rear of the Contivity 600 (see
Locate the word "top" on the plug end of the cable and align that part of the
cable with the arrow printed above the DC input port.
2
Plug the female end of the power cord into the external power supply pack.
311862-C Rev 00
Warning: Do not modify or use the AC power cord if it is not the exact
type that is required for your power outlet.
Description
The power cord must be rated for the available AC voltage and
must have a current rating that is at least 125 percent of the
gateway's current rating (100—240 VAC).
The power cord must have certification marks from an
acceptable regional agency.
It must be a flexible HAR (harmonized) cord or VDE-certified
cordage to comply with the gateway's safety certifications.
The connector that you plug into the AC receptacle on the
Contivity 600 power supply must be an IEC 320, Sheet C13
female.
The power cord must terminate in a male plug with
appropriate grounding.
Caution: Before you connect the power supply to the gateway, connect
the cables to the Ethernet and serial ports and to the ports on the installed
option card.
Table
3.
Figure 2 on page
23).

Advertisement

Table of Contents
loading

This manual is also suitable for:

Contivity 600

Table of Contents