Installation; Mounting Controller - Bard CompleteStat CS9B-THO Installation Instructions Manual

Hide thumbs Also See for CompleteStat CS9B-THO:
Table of Contents

Advertisement

IMPORTANT: For optimum temperature sensor
performance, the Bard CompleteStat
mounted on an interior wall and away from any heat
sources, sunlight, windows, air vents, air circulation
obstructions and/or any other cause of erratic or
false temperature sensing. Thermostat covers are
not recommended as they interfere with motion and
temperature sensing.

Mounting Controller

1. To complete rough-in wiring, it is recommended to
use 18 AWG solid-conductor control wiring is used.
See the low voltage wiring diagrams beginning on
page 14 for exact number of conductors.
NOTE: Shielded wire must be used in applications
where transient signals may accumulate and affect
digital signal from control to unit.
2. Turn the hex screws in the bottom and top of the
controller clockwise (inward) until they clear the
cover. Remove base plate from controller.
Dimensions in Inches (mm)
Models
A
CS9B(E)-THO
1.125 (29)
CS9B(E)-THOC
1.437 (36.5)
must be
TM
B
C
4.192 (106)
5.551
(141)
5.192 (132)
3. Route completed wiring through base plate.
4. With the embossed "UP" arrows of the base plate
pointing in the appropriate direction, fasten the
base plate to the desired wall location. A vertical/
horizontal 2x4 wall handybox can be used for the
CO
-sensing CompleteStat™ and a vertical-only
2
2x4 wall handybox can be used for non-CO
sensing CompleteStat™.
5. Make appropriate control wire connections (see low
voltage wiring diagrams) to terminal blocks.
6. Replace controller over base plate, being careful
not to pinch/dislodge connections.
7. Turn hex screws in bottom/top of controller counter-
clockwise (outward) to secure cover.

INSTALLATION

-
2
Manual
2100-566F
Page
3 of 24

Advertisement

Table of Contents
loading

Table of Contents