10. Close the control panel into its original position and secure it with the two access screws.
11. Install the high voltage cover panel and secure it with the two retaining screws.
12. Close the EasyTouch load center front door. Fasten the two spring latches.
13. Switch the power on to the EasyTouch load center.
Control panel
access screw
EasyTouch Load Center (front view)
Control panel
access screw
Retaining screw
High voltage
cover panel
IntelliPro Installation and User's Guide
11