Commissioning

6.1

General requirements

Before commissioning it must be checked that:
● The device has been installed and connected in accordance with the guidelines provided
● Device installed in hazardous area meets the requirements described in "Installation in
6.2

Warnings

If the sensor and the transmitter are ordered separately, a "Set To Default" routine must be
performed. This can be done via SIMATIC PDM or via LUI in menu item 3.3.3.
Certain parts inside the device carry dangerous high voltage. The housing must be closed
and grounded before switching the device on.
The sensor connected to this device can be operated with high pressure and corrosive
media. Therefore improper handling of the device can lead to serious injuries and/or
considerable material damage.
Commissioning and operation with pending error
If an error message appears, correct operation in the process is no longer guaranteed.
 Check the gravity of the error
 Correct the error
 If the device is faulty:
SITRANS FC430 with HART
Operating Instructions, 03/2012, A5E03361511-01
in "Installing/mounting" (Page 35) and "Connecting" (Page 51).
hazardous locations" (Page 18).
CAUTION
WARNING
WARNING
WARNING
– Take the device out of operation.
– Prevent renewed commissioning.
6
69