Installation And Commissioning; Installation - Siemens 9810 Series User Manual

Hide thumbs Also See for 9810 Series:
Table of Contents

Advertisement

9410 series - User manual

Installation and commissioning

This chapter supplements the meter installation guide and provides guidance on commissioning
your meter.
• See your device installation guide for information related to installation.
• See your product catalog pages at Siemens for information about your device, its options, and
accessories.
• Download updated documentation from www.usa.siemens.com/pds.
For the latest information about your product, or for assistance in advanced features and custom
functionality, contact your local Siemens representative.

Installation

Installation, wiring, testing and service must be performed in accordance with all local and
national electrical codes.
HAZARD OF ELECTRIC SHOCK, EXPLOSION OR ARC FLASH
Failure to follow these instructions will result in death or serious injury.
• Apply appropriate Personal Protective Equipment (PPE) and follow safe electrical work
practices. See NFPA 70E, CSA Z462 or other local standards.
• Turn off all power supplying this device and the equipment in which it is installed before
working on or in the equipment.
• Always use a properly rated voltage sensing device to confirm that all power is off.
• Do not use the data from the meter to confirm power is off.
• Do not exceed the maximum ratings of this device.
• Do not short secondary terminals of Voltage Transformer (VT).
• Do not open secondary terminals of Current Transformer (CT).
• Ground secondary circuit of CTs.
• Do not install CTs in equipment where they exceed 75% of the wiring space of any cross-
sectional area in the equipment.
• Do not install CTs in areas where ventilation openings may be blocked or in areas of breaker
arc venting.
• Do not install CTs using Class 2 wiring methods or connect to Class 2 equipment. See NFPA
70.
• Secure CT secondary conductors to ensure they do not contact live circuits.
• Assume communications and I/O wiring are hazardous live until determined otherwise.
• Replace all devices, doors and covers before turning on power to this equipment.
7EN05-0336-09
DANGER
Installation and commissioning
56

Advertisement

Table of Contents
loading

This manual is also suitable for:

9410 series

Table of Contents