Motor And Brake Assembly; Motor Control Valve Assembly - JLG 600A Service And Maintenance Manual

Table of Contents

Advertisement

SECTION 3 - CHASSIS & TURNTABLE

Motor and Brake Assembly

NOTE: Refer to Figure 3-49.
1. Alternate stators (8K) (O.D. lobes) with rotors (8J) (I.D.
splines) into bore of brake housing (6). starting with a
stator (8K) and ending with a stator (8K).
2. Grease the O-rings (8F) & (8D) and backup rings (8H) &
(8E). and place them in their respective grooves in the
brake housing (6) and piston (8A). Make sure the backup
rings are correctly positioned.
3. Apply grease sparingly to the piston O.D. (8A) and the
bore of the brake housing (6). Insert piston (8A) into
brake housing (6) be sure not to damage the O-rings.
4. Install springs (8L) into the spring pockets of the piston
(8A).
5. Test the brake and perform the roll test. Remove the
brake test plate.
6. Install the O-ring (26) onto the pilot of the motor (31),
use grease to keep the O-ring in place.
7. Place motor (31) into Brake pilot, and line up holes.
8. Assemble lift lugs (28) onto hex bolts (29). Assemble hex
bolts (29) with lift lugs (28) through the motor (31) and
brake (6) against Motor flange. Torque to 80-100 ft. lbs.
(108-136 Nm).
3-72

Motor Control Valve Assembly

NOTE: Refer to Figure 3-48.
1. Lay assembly down with motor ports facing up. Remove
the two plastic plugs in the motor ports, being careful
not to lose the O-ring in each port. Assemble the motor
control valve (32) onto the motor (31) with bolt (21) and
lock washers (22). Torque bolts (21) to 23-27 ft. lbs. (31-
37 Nm).
NOTE: Be sure to align the holes in the control valve with the
motor ports.
2. Install elbow fittings (30) into brake (6). Do not tighten
jam nuts.
3. Install elbow fittings (30) into motor control valve (32).
Do not tighten jam nuts.
4. Assemble tube (35) into elbow fittings (30) and torque
to 13-15 ft. lbs. (18-20 Nm). Tighten the jam nuts on the
elbow fittings (30) and torque to 13-15 ft. lbs. (18-20
Nm).
5. Install one O-ring plug (23) into motor control valve (32)
and torque to 30-31 fI.lbs. (41-42 Nm).
6. Pressure test brake, tube and control valve connections
by applying 3000 psi (207 bar) pressure to the open port
in the Motor Control Valve (32) and holding lor 1 minute.
Check lor leaks at the control-valve-motor interface and
the tube connections. Release pressure and install the
remaining O-ring plug (23) into motor control valve (32)
and torque to 30-31 ft. lbs. (41-42 Nm).
3121201

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

600aj

Table of Contents