II. Knock-Down Boiler Assembly
A
. REMOVAL OF BOILER.
1. Remove, all boiler to skid, hold down fasteners.
Refer to Figure 3.
2. Carefully walk boiler to the edge of skid. Tilt the
boiler back, allowing an edge to rest on the floor,
and remove the skid.
Figure 3: Base on Skid
B
. TEST HEAT EXCHANGER FOR LEAKS before
proceeding with jacket assembly. Heat exchanger,
canopy, and base are preassembled.
1. Install pressure gauge supplied, a hose to the city
water and a valve in the supply tapping. Plug
remainder of tappings.
2. Fill boiler with water and apply a pressure of at least
10 psig but no more than 30 psig.
Do not apply more than 30 psig to boiler.
Any combustion chamber which was damaged
must be replaced immediately.
If heat exchanger is not square on base DO NOT
twist. Carefully lift and reposition.
Do not assemble boiler without cerafelt gaskets
between
chamber. Gaskets must also be between canopy
and heat exchanger.
C.
Figure 4: Coil Plate Attachment
WARNING
WARNING
CAUTION
WARNING
heat
exchanger
INSTALLING THE JACKET
1. Before jacket can be secured to boiler assembly
tankless heater coil or blank plate must be attached.
Using rubber gasket and bolts provided secure
heater coil or blank plate to boiler extension
by inserting the bolts from the backside of the
extension. Refer to Figure 4.