Fuel Shut-Off Solenoid; High Altitude Operation; Unitized Throttle And Choke Control; Throttle Cable Adjustment - Kohler Courage SV470 Service Manual

Vertical crankshaft
Hide thumbs Also See for Courage SV470:
Table of Contents

Advertisement

Figure 5-10. Installing Float and Fuel Inlet Needle.
solenoid.
Torque the bowl retaining screw to 5.1-6.2 N·m
(45-55 in. lb.).

Fuel Shut-off Solenoid

solenoid installed in place of the bowl retaining screw
solenoid, verify that the correct shutdown procedure
the engine must be running between half and full
the carburetor body to the air cleaner base mounting
screw is properly connected.
and catch any fuel spilling from the carburetor as the
solenoid is removed.
Bench test the solenoid by grounding the solenoid
case and applying 12 volt DC to the spade terminal. If
the plunger does not retract, the solenoid is faulty and
whenever the solenoid is installed. Refer to the wiring
solenoid.
Fuel System and Governor
Figure 5-11. Fuel Shut-Off Solenoid.

High Altitude Operation

of speed and power, poor fuel economy, and poor or
slow governor response.
high altitude main jet can be installed. High altitude

Unitized Throttle and Choke Control

Throttle Cable Adjustment

Cable
Clamp
Figure 5-12. Speed Control Bracket with Unitized
Throttle/Choke Control.
Section 5
5
5.9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents