Top Vent - Horizontal Termination - (continued)
Two Elbows
Note: Use SLP Series
components only.
Note: There MUST be a 25%
reduction in total H when
using flex vent except when
using the simple up and out
installation. See Figure 4.8.
WARNING *
Fire Risk.
• When using SLP-HRC-SS termination cap
on top vented fireplaces, a one foot minimum
vertical vent section is required before installing
first elbow.
H
2
Figure 4.13
Majestic • QUARTZPLA36IN / QUARTZPLA36IL Installation Manual • 2643-980 Rev. B • 7/22
V Minimum
90º Elbow*
1/2 ft.*
152 mm
1-1/2 ft.*
457 mm
2-1/2 ft.*
762 mm
3-1/2 ft.
1.1 m
4-1/2 ft.
1.4 m
H
1
V
+ H
1
INSTALLED
HORIZONTALLY
NOT ALLOWED
1 ft.
2 ft.
4 ft.
6 ft
14 ft.
+ H
Maximum= 14 ft. (4.3 m)
2
+ H
Maximum= 40 ft. (12.2 m)
1
2
* See warning below
H
1
H Maximum
All Models
305 mm
610 mm
1.2 m
1.8 m
4.3 m
V