Gateway Installation; Pin Assignments; Commissioning - Briggs & Stratton SIMPLIPHI Installation Manual

6kw hybrid inverter
Table of Contents

Advertisement

Wi-Fi Network Requirements: Refer to the EnergyTrak manual for more information.
CAUTION!
BRIGGS & STRATTON DOES NOT RECOMMEND OR SUPPORT THE USE OF A
WIRELESS CONNECTION. AN UNRELIABLE WIRELESS NETWORK CONNECTION CAN
DISRUPT TIMELY FIRMWARE UPDATES, WHICH COULD LEAD TO SYSTEM FAILURES
AND LOSS OF WARRANTY COVERAGE.
10.2 – Gateway Installation
Refer to the full EnergyTrak Installation Manual for detailed instructions and diagrams on set-up and
programming.
1. Connect the Gateway to the SimpliPHI 6kW Inverter with the provided CAT5 cable.
2. If using a hardwired network connection (recommended), connect the Gateway to the site's local
network using an Ethernet cable.
3. Connect the Gateway Power Supply to the SimpliPHI 6kW Inverter with the provided cable.
10.3 – Pin Assignments
Table 10.0: Pin Assignment for RS-232 Communications Port
PIN 1
PIN 2
PIN 3
PIN 4
PIN 5
PIN 6
PIN 7
PIN 8
Table 10.1: Pin Assignment for BMS Communications Port
PIN 1
PIN 2
PIN 3
PIN 4
PIN 5
PIN 6
PIN 7
PIN 8

11.0 -Commissioning

Prior to commissioning equipment, check the following requirements and follow proper electrical procedures:
STEP 1: Confirm All Connections and Voltage
Ensure that all installation processes and procedures are complete and followed in previous sections.
© SIMPLIPHI POWER
Definition
RS232TX
RS232RX
NC
8~12V
NC
NC
NC
GND
Definition
RS232TX
RS232RX
NC
8~12V
NC
NC
NC
GND
| 26 |
REV2022007071630

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sphi-in-6

Table of Contents