Mounting The Heat Exchanger Unit; Precautions When Mounting The Heat Exchanger Unit; Guidelines When Installing The Heat Exchanger Unit - Daikin RDXYQ5T8V1B Installer And User Manual

Heat pump for indoor installation
Table of Contents

Advertisement

15.4 Mounting the heat exchanger unit

15.4.1 Precautions when mounting the heat exchanger unit

15.4.2 Guidelines when installing the heat exchanger unit

RKXYQ5T8+8T7Y1B + RDXYQ5T8+8T7V1B
VRV IV heat pump for indoor installation
4P499898-1B – 2021.12
a Anchor point (4×)
INFORMATION
The recommended height of the upper protruding part of the bolts is 20 mm.
INFORMATION
Also read the precautions and requirements in the following chapters:
General safety precautions
Preparation
INFORMATION
Optional equipment. When installing optional equipment, also read the installation
manual of the optional equipment. Depending on the field conditions, it might be
easier to install the optional equipment first.
Suspension bolts. Use suspension bolts for installation. Check whether the
ceiling is strong enough to support the weight of the unit. If there is a risk,
reinforce the ceiling before installing the unit.
Attach the hanger bracket to the suspension bolt. Fix it securely by using a nut
and washer from the upper and lower sides of the hanger bracket.
1497
a1 Nut
a2 Double nut
b Washer
c Hanger bracket
Drain water flow. Make sure drain water flows to the drain pipe connection.
a
B
A
a Drain pipe connection
(mm)
A
a
0~2°
B
a
0~2°
15
Unit installation
|
a1
b
c
b
a2
Installer and user reference guide
65

Advertisement

Table of Contents
loading

Table of Contents