Maintenance And Service; Maintenance After A Long Stop Period - Daikin RDXYQ5T8V1B Installer And User Manual

Heat pump for indoor installation
Table of Contents

Advertisement

9
|

Maintenance and service

9 Maintenance and service
In this chapter

9.1 Maintenance after a long stop period

Installer and user reference guide
34
NOTICE
NEVER inspect or service the unit by yourself. Ask a qualified service person to
perform this work.
WARNING
NEVER replace a fuse with a fuse of a wrong ampere ratings or other wires when a
fuse blows out. Use of wire or copper wire may cause the unit to break down or
cause a fire.
CAUTION
Do NOT insert fingers, rods or other objects into the air inlet or outlet. Do NOT
remove the fan guard. When the fan is rotating at high speed, it will cause injury.
CAUTION
After a long use, check the unit stand and fitting for damage. If damaged, the unit
may fall and result in injury.
NOTICE
Do NOT wipe the controller operation panel with benzine, thinner, chemical dust
cloth, etc. The panel may get discoloured or the coating peeled off. If it is heavily
dirty, soak a cloth in water-diluted neutral detergent, squeeze it well and wipe the
panel clean. Wipe it with another dry cloth.
9.1
Maintenance after a long stop period ...................................................................................................................................
9.2
Maintenance before a long stop period ................................................................................................................................
9.3
About the refrigerant .............................................................................................................................................................
9.4
After-sales service and warranty............................................................................................................................................
9.4.1
Warranty period.....................................................................................................................................................
9.4.2
Recommended maintenance and inspection........................................................................................................
9.4.3
Recommended maintenance and inspection cycles .............................................................................................
9.4.4
Shortened maintenance and replacement cycles.................................................................................................
E.g., at the beginning of the season.
Check and remove everything that might be blocking inlet and outlet vents of
indoor units and heat exchanger unit.
Clean air filters and casings of indoor units and heat exchanger unit. Contact your
installer or maintenance person to clean the air filters and casings of the indoor
units and the heat exchanger unit. Maintenance tips and procedures for cleaning
are provided in the installation/operation manuals of dedicated indoor units.
Make sure to install cleaned air filters back in the same position.
Turn on the power at least 6 hours before operating the unit in order to ensure
smoother operation. As soon as the power is turned on, the user interface
display appears.
RKXYQ5T8+8T7Y1B + RDXYQ5T8+8T7V1B
VRV IV heat pump for indoor installation
4P499898-1B – 2021.12
34
35
35
35
35
36
36
37

Advertisement

Table of Contents
loading

Table of Contents