Setup

Setup
Setup
Setup

Grounding

Grounding
Grounding
The equipment must be grounded to reduce
the risk of static sparking and electric shock.
Electric or static sparking can cause fumes
to ignite or explode. Grounding provides an
escape wire for the electric current.
• Reactor:
Reactor: system is grounded through the
Reactor:
power cord.
• Hose:
Hose: use only Reactor 3 hoses to ensure
Hose:
static ground continuity. Check electrical
resistance of hoses from the gun to the
Reactor system ground. If total resistance
exceeds 29 mega Ohms, replace hose(s)
immediately.
• Spray
Spray gun:
Spray
gun: spray gun is grounded through
gun:
Reactor 3 hoses. Use only Reactor 3 heated
hoses.
Fluid supply
supply containers:
containers: follow your local
• Fluid
Fluid
supply
containers:
code.
Object being
being sprayed:
sprayed: follow your local code.
• Object
Object
being
sprayed:
Solvent pails
pails used
used when
when flushing:
• Solvent
Solvent
pails
used
when
local code. Use only metal pails, which are
conductive, placed on a grounded surface.
Do not place pail on a nonconductive surface,
such as paper or cardboard, which interrupts
grounding continuity.
• To
To maintain
To
maintain grounding
maintain
grounding
grounding continuity
flushing or or or relieving
relieving pressure:
flushing
flushing
relieving
part of spray gun firmly to the side of a
metal
grounded
pail, then trigger gun.
Tools
Tools
Tools Required
Required
Required for
• 1.25 in. wrench
• 1 1/16 in. wrench
• 7/8 in. or 22 mm wrench
• 5.8 in. wrench
• 1 in. wrench
• 11/16 in. wrench
• 3/4 in. or 19 mm wrench
• 3/8 in. socket
• Flat-head screwdriver
• 18 in. adjustable wrench
26
flushing: follow your
flushing:
continuity when
continuity
when
when
pressure: hold a metal
pressure:
for Setup
for
Setup
Setup
General Equipment
Equipment Guidelines
General
General
Equipment
NOTICE
NOTICE
NOTICE
Failure to properly size the generator may
result in damage. To avoid damage to the
equipment, follow the guidelines listed below.
• Determine the correct size generator. Using
the correct size generator and proper air
compressor will enable the proportioner to
run at a nearly constant RPM. Failure to do
so will cause voltage fluctuations that can
damage electrical equipment. To determine
the correct size generator:
1. List peak wattage requirements of all
system components.
2. Add the wattage required by the system
components.
3. Perform the following equation:
Total watts x 1.25 = kVA
(kilovolt-amperes)
4. Select a generator size that is equal to or
greater than the determined kVA.
• Size the proportioner power cord using the
electrical ratings in
to do so will cause voltage fluctuations that
can damage electrical equipment.
• Use an air compressor with continuous run
head unloading devices. Direct online air
compressors that start and stop during a
job will cause voltage fluctuations that can
damage electrical equipment.
• Maintain and inspect the generator, air
compressor, and other equipment per the
manufacturer recommendations to avoid
an unexpected shutdown. Unexpected
equipment shutdown will cause voltage
fluctuations that can damage electrical
equipment.
• Use a wall power supply with enough current
to meet system requirements. Failure to do
so will cause voltage fluctuations that can
damage electrical equipment.
Guidelines
Guidelines
Models, page 4
. Failure
3A8500B

Advertisement

Table of Contents
loading

This manual is also suitable for:

Reactor 3 e-20 proReactor 3 e-20 eliteReactor 3 e-30 standardReactor 3 e-30 proReactor 3 e-30 eliteReactor 3 e-xp1 standard ... Show all

Table of Contents