Typical Installation
Installation
Typical
Typical
Installation
Typical
Typical
Typical Installation
Installation without
Installation
A
Figure 1
Key
Key
Key
A
Reactor Proportioner
B *�
Heated Hose Bundle
D �
Heated Whip Hose
E �
Gun Manifold
F �
Gun Air Supply Hose
* Shown exposed for clarity. Wrap with tape during operation.
�Not Included.
3A8500B
without
without circulation
circulation
circulation
H �
Agitator Air Supply Line
J �
Fluid Supply Lines
K �
Transfer Pumps
L �
Agitator
M �
Desiccant Dryers
N
Bleed Lines
P �
Gun Fluid Manifold
FTSA*�
Fluid Temperature Sensor (A side)
FTSB *�
Fluid Temperature Sensor (B side)
Typical Installation
15