Installation; Location; Tools Required For Installation; Assemble The Proportioner - Graco Reactor 3 E-20 Standard Operation

Proportioning systems
Hide thumbs Also See for Reactor 3 E-20 Standard:
Table of Contents

Advertisement

Installation

Installation
Installation
Installation

Location

Location
Location
For ease of operation and maintenance, ensure
there is adequate lighting in the area the Reactor
is installed for visibility and safety.
For ease of operation and maintenance, ensure
there is adequate space to the front and sides
of the Reactor to access valves or use wrenches
and tools.
Tools
Tools Required
Tools
Required for
Required
9/16 in. socket or wrench
Assemble
Assemble the
Assemble
the Proportioner
the
Proportioner
Proportioner
Reactor proportioners arrive in a shipping
configuration. Before mounting the system,
assemble the proportioner in the upright
position.
1. Remove the TSL bottle mounting bracket
screws. Ensure the bracket can swivel freely.
24
for Installation
for
Installation
Installation
2. Remove the enclosure pivot arm screws (ES).
3. Lift the electrical enclosure (EE). Ensure the
TSL bottle remains upright as you lift the
electrical enclosure.
4. Place the left and right wall mounting
brackets (MB) as shown in Fig.
enclosure pivot arm screws (ES) through
the brackets (MB) and tighten to secure the
enclosure.
Figure 4 Install Wall Mounting Brackets
Fig. 4. 4. 4. Insert the
Fig.
3A8500B

Advertisement

Table of Contents
loading

This manual is also suitable for:

Reactor 3 e-20 proReactor 3 e-20 eliteReactor 3 e-30 standardReactor 3 e-30 proReactor 3 e-30 eliteReactor 3 e-xp1 standard ... Show all

Table of Contents