Visual Checks - Agilent Technologies 100 Automated Disintegration Apparatus Operator's Manual

Hide thumbs Also See for 100 Automated Disintegration Apparatus:
Table of Contents

Advertisement

5
Troubleshooting and Maintenance
Repairing Leaking Fittings
Complete these steps if any of your water bath fittings are leaking:
1 Turn off the heater / circulator and drain the water bath completely.
2 Remove the leaky bulkhead fitting.
3 Remove the elbow fitting from the bulkhead fitting.
4 Inspect the bulkhead fitting gaskets for damage and replace them as
5 Remove the old PTFE tape from all male fittings. Inspect the threads for
6 Apply new PTFE tape to the male fitting threads.
7 Reinstall and tighten the bulkhead fitting on the water bath.
8 Reinstall and tighten the elbow fitting to the bulkhead fitting.
9 Fill the water bath and turn on the heater / circulator.
10 Inspect the fitting for leaks. If the fitting still leaks, contact the Dissolution

Visual Checks

Panels or covers that are retained by fasteners which require the use of a tool
C AU T I O N
for removal may be opened only by Agilent-trained, Agilent-qualified, or
Agilent-authorized service engineers. See "Obtaining Warranty and Other
Services" on page 47..
100 Operator's Manual
necessary.
damage and replace the fitting as necessary.
Systems Service Department.
37

Advertisement

Table of Contents
loading

This manual is also suitable for:

G7962a

Table of Contents