How to install the cables on the connection terminals
Open the terminal by pushing the orange lever with a flat head screwdriver (blade width 2.5 mm).
l
Insert the crimped wire into the open terminal (2).
l
You can unplug the green terminal block from the system module to make it easier to install the strands
(see "Removing system components from the top hat rail" on page 24 ).
Use suitable, isolated ferrule sleeves (min. 10 mm long) as well as a crimp tool with square crimping to
form the ferrules (see "Tools and consumables" on page 23).

7.5 Terminal diagram

Terminal
Digital OUT 1
13
14
15
Digital OUT 2
16
17
18
Digital OUT 3
19
20
21
VIBGUARD IIoT
Digital inputs / outputs
Designation
NO1 (normally open
switch)
COM1 (Common)
NC1 (normally closed
switch)
NO2 (normally open
switch)
COM2 (Common)
NC2 (normally closed
switch)
NO3 (normally open
switch)
COM3 (Common)
NC3 (normally closed
switch)
Comment
Application, DOs:
Relay switching outputs
DO1, DO2 configurable as required via
OMNITREND Center Software
DO3 coupled with Alarm
Installation and Operation
39