Processor Unit - Furuno FSV-30 Installation Manual

Color scanning sonar
Hide thumbs Also See for FSV-30:
Table of Contents

Advertisement

1.2 Processor Unit

Mounting considerations
When choosing a mounting location, keep in mind the following points:
• The processor unit must be mounted upright.
• Locate the unit out of direct sunlight and away from heat sources because of heat that
can build up inside the cabinet.
• Do not locate the equipment where it may be subjected to water splash or rain.
• Be sure the mounting location is strong enough to support the weight of the unit under the
continued vibration which is normally experienced on the ship. If necessary reinforce the
mounting location.
• Determine the mounting location considering the length of the cables below.
● Signal cable from the transceiver unit
● Control cable from the control unit (when locally supplied monitor is used)
• Leave sufficient space on the sides and rear of the unit to facilitate maintenance. Also,
leave a foot or so of "service loop" in cables behind the unit so it can be pulled forward for
servicing or easy removal of connectors.
• Make free space of 400 mm between the processor unit and bulkhead to prevent cable
stress.
• Observe the compass safe distances shown on page ii to prevent interference to a
magnetic compass.
Cable fixing hole
1-8
Processor unit, rear view

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fsv-30s

Table of Contents