Warm side settings
Set the options for the heating side of the heat pump.
Green = in use, white = not in use.
Home view
Finally, open the Home screen, and tap on the Start button to permit the heat pump to
start. Once the line on the Start button turns green, the heat pump is permitted to start.

4.8 Commissioning the system

Carry out commissioning tasks according to this check list. Pay special attention to the
leakage test.
● Measure compressor current.
● Control superheating temperature.
● Check and trim expansion valve functionality.
● Define overcurrent protection device settings.
● Perform thermal protection device functional test.