Checking The Gas Setting; Warnings; Gas Operations And Setting - Biasi RINNOVA ADAPTIVE 25S User Manual And Installation Instructions

Table of Contents

Advertisement

7

CHECKING THE GAS SETTING

7.1 Warnings

Each time after measuring the gas
pressure, fully close all tapping
points that were used.
After each gas adjustment, the
valve
adjustment
must be sealed.
Warning: risk of electrocution.
The boiler is live during the opera-
tions described in this section.
Never touch any electrical parts.

7.2 Gas operations and setting

• Remove the front panel on the boiler body,
see section "Removing the body panels" on
page 67.
Checking the network pressure
• With the boiler turned off (out of service),
check the supply pressure using the tapping
point 27 in Figure 7.1 and compare the val-
ue read with those shown in the Gas supply
pressure table in section "Technical data
M300V.2025 SM" on page 26, "Technical
data M300V.2530 SM" page 30 and "Tech-
nical data M300V.3035 SM" page 34.
• Fully close the tapping point 27 in Figure 7.1.
- 60 -
CHECKING THE GAS SETTINGS
components
Figure 7.1
Check minimum burner pressure
• Connect a flue analyser to the flue gas anal-
ysis outlets on the flue gas exhaust on the
boiler Figure 7.2.
Flue gas analy-
Figure 7.2
• Make sure that the room thermostat is in the
"heat request" position.
• Draw off an abundant amount of DHW by
opening the taps.
• Enter "programming mode" by pressing the
13 and 15 keys simultaneously for 5 seconds
(Figure 7.3) until HiS (Boiler History) appears
on the LCD display (Figure 7.4).
29
27
sis outlets

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents