Filter Test - Agilent Technologies 1100 Series Reference Manual

Diode array and multiple wavelength detectors
Hide thumbs Also See for 1100 Series:
Table of Contents

Advertisement

Filter Test

The filter test checks the correct operation of the filter assembly. When the
test is started, the holmium oxide filter is moved into position. During filter
movement, the absorbance signal is monitored. As the edge of the filter passes
through the light path, an absorbance maximum is seen. Once the filter is in
position, the absorbance maximum (of holmium oxide) is determined. Finally,
the filter is moved out of the light path. During movement, an additional
absorbance maximum is expected as the edge of the filter passes through the
light path. The test passes successfully, if the two maxima resulting from the
edge of the filter assembly (during filter movement) are seen, and the
absorbance maximum of holmium oxide is within the limits.
Filter Test Evaluation
Test Failed
• Filter assembly (lever and filter) not installed.
• Defective filter motor.
Holmium Oxide Maximum out of Limits
• Holmium oxide filter not installed.
• Dirty or contaminated filter.
1100 Series DAD and MWD Reference Manual
Probable Causes
Suggested Actions
Install the filter assembly.
Exchange the filter motor.
Probable Causes
Suggested Actions
Install the holmium oxide filter.
Exchange the holmium oxide filter.
Troubleshooting and Test Functions
3
93

Advertisement

Table of Contents
loading

Table of Contents