1 1
. General installation Guide
. General installation Guide
4. Installation process & Guideline
4. Installation process & Guideline
Striking a balance between System Installation & General Construction Work.
Striking a balance between System
:
:
1.
1.
Note
Note
2. Keep a constant check on the progress of the construction work to avoid deviations
2. Keep a constant check
3. For sleeve and insert work the positions of ceiling girders
3. For sleeve and i
. .
should be thoroughly clarified. (This applies particularly to work relating to
should be thoroughly clarified. (This applies particularly to work relating to
Work scope
Work scope
the connection of control wiring, fitting of remote controller and central control panel,
the connection of control wiring, fitting of remote controller and ce
boundary work on areas such as connection of drain piping and humidification supply
boundary work on areas such as c
piping, inspection and foundation)
piping, inspection and foundation)
from the air conditioning work schedule.
from the air conditioning work schedule.
nsert work the positions of ceiling girders should be confirmed and
sleeve and insert requirement, hole diameters, positioning and numbers decided. This
sleeve and insert requirement, hole diameters, positioning and numbers decided. This
is particularly important in the case of sleeves for drain piping.
is particularly important in the case of sleeves for drain piping.
Installation & General Construction Work.
onnection of drain piping and humidification supply
on the progress of the construction work to avoid deviations
8 8
ntral control panel,
should be confirmed and