(3) Brazing the branch pipes
(3) Brazing the branch pipes
Picture
Picture
3) Refrigerant pipe works (air tightness works)
3) Refrigerant pipe works (air tightness works)
(1) Entry of nitrogen
(1) Entry of nitrogen
Picture
Picture
(2) Finishing the end of the pipe
(2) Finishing the end of the pipe
Picture
Picture
(3) Pressure gauge attached
(3) Pressure gauge attached
Picture
Picture
Work Description
Work
Description
   
Brazing the
Brazing the
branch pipe.
branch pipe.
Work
Work Description
Description
   
Entry of nitrogen.
Entry of nitrogen.
Inject nitrogen to
Inject nitrogen to
the pipe to test
the pipe to test
leakages.
leakages.
   
Work Description
Work Description
Wrap the end of
Wrap the end of
the pipe before
the pipe before
connecting the
connecting the
equipment, so
equipment, so
that nitrogen
that nitrogen
won't escape.
won't escape.
   
Work
Work Description
Description
st st
Mark the 1
Mark the 1
 and
 and
nd
nd
2 2
 pressure to
 pressure to
see if it leaks.
see if it leaks.
Things to to do
Things
do
- Nitrogen substituted
- Nitrogen substituted
brazing works on the
brazing works on the
branch pipe to prevent
branch pipe to prevent
generation of foreign
generation of foreign
substance/oxide
substance/oxide
- Check for adequate
- Check for adequate
pressure (0.01 to
pressure (0.01 to
2 2
0.1kg/cm
0.1kg/cm
 )  )
Things to to do
Things
do
Inject nitrogen at the
Inject nitrogen at the
proper pressure.
proper pressure.
st st
2 2
1 1
: 10kg/cm
: 10kg/cm
   
nd
nd
2 2
2 2
: 41kg/cm
: 41kg/cm
   
Things
Things to to do
do
   
Sufficient brazing on the
Sufficient brazing on the
end of the pipe.
end of the pipe.
Things
Things to to do
do
st st
2 2
1 1
: 10kg/cm
: 10kg/cm
   
nd
nd
2 2
2 2
: 28kg/cm
: 28kg/cm
 look at the
 look at the
scale.
scale.
13
13
Installation guide
Installation guide
Check
Check point
point
Check the pressure and entry
Check the pressure and entry
of nitrogen.
of nitrogen.
Check
Check point
point
In the presence of the
In the presence of the
manager, check air tightness.
manager, check air tightness.
Fill out the check forms.
Fill out the check forms.
Check point
Check
point
 Visual inspection
 Visual inspection
Check
Check point
point
Check for leakages.
Check for leakages.
   