Samsung MXJ-YA1509 Series Installation Manual page 23

Table of Contents

Advertisement

   
(2) Panel installation
(2) Panel installation
Picture
Picture
(3) Finish
(3) Finish
Picture
Picture
10) Test operation
10) Test
operation
(1) Indoor unit address setting
(1) Indoor unit address setting
Picture
Picture
(2) Outdoor unit address setting
(2) Outdoor unit address setting
Picture
Picture
   
Work Description
Work
Description
Panel installation
Panel installation
Work Description
Work
Description
   
End
End
Work Description
Work
Description
   
 Assign a unique
 Assign a unique
number to the
number to the
indoor unit.
indoor unit.
Work Description
Work
Description
   
 Assign a unique
 Assign a unique
number to the
number to the
outdoor unit.
outdoor unit.
Things
Things to to do
do
- Do not apply excessive
- Do not apply excessive
force.
force.
- Use a clean glove.
- Use a clean glove.
Things
Things to to do
do
Check the levelness and
Check the levelness and
any blade damage.
any blade damage.
Things to to do
Things
do
 Assign an accurate
 Assign an accurate
address to it.
address to it.
Things to to do
Things
do
 Assign an accurate
 Assign an accurate
address to it.
address to it.
23
23
Installation guide
Installation guide
Check
Check point
point
- Check if the exterior is dirty.
- Check if the exterior is dirty.
- Check for damage.
- Check for damage.
Check
Check point
point
Check for twisting and test
Check for twisting and test
the entire unit.
the entire unit.
Check point
Check
point
Check the address of the
Check the address of the
indoor unit.
indoor unit.
Check point
Check
point
Check the address to the
Check the address to the
outdoor unit.
outdoor unit.
   

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents