Samsung MXJ-YA1509 Series Installation Manual page 10

Table of Contents

Advertisement

   
1 1
. General installation Guide
. General installation Guide
5-2. Step by Step Installation Procedure
5-2. Step by Step Installation Procedure
1) 1)
   
Refrigerant piping
Refrigerant piping
(1) Pre-estimation with the drawing
(1) Pre-estimation with the drawing
Picture
Picture
(2) Straightening the refrigerant pipe
(2) Straightening the refrigerant pipe
Picture
Picture
(3) Marking
(3) Marking
Picture
Picture
(4) Cutter (cutting)
(4) Cutter (cutting)
Picture
Picture
Work
Work Description
Description
   
Measure the actual
Measure the actual
construction
construction
drawing.
drawing.
Work
Work Description
Description
   
Straighten the
Straighten the
refrigerant pipe.
refrigerant pipe.
Work
Work Description
Description
   
 Accurate marking
 Accurate marking
of the length.
of the length.
Work Description
Work
Description
   
Use a copper
Use a copper
cutter to cut it.
cutter to cut it.
   
Things to to do
Things
do
Check what and how
Check what and how
much you prepare for
much you prepare for
installation.
installation.
Things to to do
Things
do
Considering the job site
Considering the job site
condition, measure the
condition, measure the
accurate length to cut.
accurate length to cut.
Things to to do
Things
do
Consider the diagram and
Consider the diagram and
the actual site condition
the actual site condition
when marking it.
when marking it.
Things
Things to to do
do
- Use proper Size & Quality
- Use proper Size & Quality
Cutting tool
Cutting tool
- Do not apply excessive
- Do not apply excessive
force.
force.
(Prevent deformation of the
(Prevent deformation of the
   
pipe.)
pipe.)
10
10
Check
Check point
point
Fully familiarize with the diagram
Fully familiarize with the diagram
to prevent problems while
to prevent problems while
working on the site.
working on the site.
Check
Check point
point
- Remove sharp object or
- Remove sharp object or
something that can cause
something that can cause
deformation of the pipe in
deformation of the pipe in
advance.
advance.
- Do not apply excessive force
- Do not apply excessive force
for straightening the pipe.
for straightening the pipe.
Check point
Check
point
Compare the marked area with
Compare the marked area with
the diagram accurately.
the diagram accurately.
Check
Check point
point
While cutting the copper pipe,
While cutting the copper pipe,
check for deformation of the
check for deformation of the
pipe.
pipe.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents