(1) Construct a concrete foundation in accordance with the standards for the site where outdoor unit
(1) Construct a concrete foundation in accordance with the standards for the site where outdoor unit
is being installed.
is being installed.
① ①
   
H-beam: over 200mm
H-beam: over 200mm
② ②
 Area of the concrete foundation must be 1.5 times larger than the outdoor unit.
  Area of the concrete foundation must be 1.5 times larger than the outdoo
   
③ ③
Concrete foundation shouldn't be slanted and condensed water needs to flow away without
Concrete foundation shouldn't be slanted and condensed water needs to flow away without
   
any stagnation
any stagnation
(2)
(2)       After
 After placing
placing the
bolt(M12).
bolt(M12).
(3)
(3)     Install the anti-vibration pad between
Install the anti-vibration pad between the outdoor unit, H-beam and the concrete foundation.
(t = over 20mm)
(t = over 20mm)
the outdoor
outdoor unit
unit on
on the
the basic
the outdoor unit, H-beam and the concrete foundation.
121
121
   
basic foundation,
foundation, fix fix the
the outdoor
r unit.