5.
Lower the equipment frame with the
mechanical lever. Insert a small
screwdriver or the like through the chain,
so that it can not slide into the frame
tunnel, and release the chain from the
equipment frame.
6.
Remove the equipment frame's rear
guide screws. In order to completely
lower the equipment frame on the left-
hand side, it must first be pulled back.
7.
Pull out the equipment frame.
Assembly
1.
Push in the equipment frame. Make sure
that the height adjustment stay is
inserted into the equipment frame.
2.
Hook the springs on the equipment
frame as illustrated.
3.
Assemble the equipment frame in the
reverse order in relation to dismantling.
4.
Adjust the ground pressure, see
"Checking and Adjusting the Ground
Pressure" on page 87.
80
English-
REPAIR INSTRUCTIONS
Chain bracket
Rear guide screw
Equipment frame pulled forwards
Spring placement