Vision Fitness Vision Series Service Manual page 42

Hide thumbs Also See for Vision Series:
Table of Contents

Advertisement

RUNNING BELT/DECK/ROLLER REPLACEMENT
Tools required:
Philips screwdriver
T-handle key (6mm,5mm)
Procedure:
8. Turn the flywheel counterclockwise by using your left hand and pull the
drive belt out from the pulley of the front roller by using your right hand.
9. Loosen the screws from the front and rear rollers, remove the front roller
and rear roller.
(If replacing the roller, go to step 13)
10. Loosen the 8 screws holding the deck to the frame then remove the deck
with the running
11. Remove the fix plate with screwdriver.
Replace the deck and tighten the fix plate, then install a new running belt.
(Go to step 14)
11. Replace the deck and center the running belt.
12. Tighten the deck screws and assemble the rear roller first, then assemble
the front roller.
( Go to step 16)
13. Replace the front roller and rear roller.
14. Tighten the deck screws.
15. Assemble the rear roller first, and then assemble the front roller.
16. Turn the flywheel clockwise with your left hand and place the drive belt
onto grooves of the front roller pulley with your right hand.
17. Install the front and rear rollers and adjust the belt tension screw such
that you can only press with your thumb the belt down 1cm ~ 1.5cm.
belt.(If replacing the running deck, go to step 11)
7-5
(Go to step 15)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

T9200T9250T9300T9400hrtT9350T9450hrt ... Show all

Table of Contents