A-Downflow Discharge Application
Roof Mounting with S1CURB10E-1
1- The S1CURB10E-1 roof mounting frame must be
installed, flashed and sealed in accordance with the
instructions provided with the frame.
2- The S1CURB10E-1 roof mounting frame should be
square and level to 1/16" per linear foot (1.6mm per 305
linear mm) in any direction.
3- Duct must be attached to the roof mounting frame and
not to the unit; supply and return plenums must be
installed before setting the unit.
Installer's Roof Mounting Frame
Many types of roof frames can be used to install the unit
depending upon different roof structures. Items to keep in
mind when using the building frame or supports are:
1- The base is fully enclosed and insulated, so an
enclosed frame is not required.
2- The frames or supports must be constructed with
non-combustible materials and should be square and
level to 1/16" per linear foot (1.6mm per 305 linear mm)
in any direction.
3- Frame or supports must be high enough to prevent any
form of moisture from entering unit. Recommended
minimum frame height is 14" (356mm).
4- Duct must be attached to the roof mounting frame and
not to the unit. Supply and return plenums must be
installed before setting the unit.
NOTE - Top clearance unobstructed.
É É É É É É É É É É É É É É É É É É É É
É É É É É É É É É É É É É É É É É É É É
É É É É É É É É É É É É É É É É É É É É
96 (2438)
É É É É É É É É É É É É É É É É É É É É
É É É É É É É É É É É É É É É É É É É É
É É É É É É É É É É É É É É É É É É É É
É É É É É É É É É É É É É É É É É É É É
72
(1829)
É É É É É É É É É É É É É É É É É É É É
É É É É É É É É É É É É É É É É É É É É
É É É É É É É É É É É É É É É É É É É É
60 (1524)
É É É É É É É É É É É É É É É É É É É É
É É É É É É É É É É É É É É É É É É É É
É É É É É É É É É É É É É É É É É É É É
1" (25mm) supply duct clearance for a distance of 3' (914m)
is required on LC units equipped with electric heat.
420, 480, 540, 600 SERVICE CLEARANCES - inches (mm)
Heat
Section
Blowers
60 (1524)
96 (2438)
FIGURE 1
5- Units require support along all four sides of unit base.
Supports must be constructed of steel or suitably
treated wood materials.

Duct Connection

All exterior ducts, joints and openings in roof or building
walls must be insulated and weather-proofed with flashing
and sealing compounds in accordance with applicable
codes. Any duct passing through an unconditioned space
must be insulated.
In downflow applications, do not drill or punch holes
in base of unit. Leaking in roof may occur if unit base
is punctured.
Horizontal Supply Air
1- Locate horizontal discharge air flanges in blower
section.
2- Remove and discard horizontal supply air shipping
cover from supply air panel on back side of unit. See
figure 2.
3- Position flanges as shown in figure 2. Make sure the
narrow side of the flange is positioned on the inside of the
unit panel. Secure with screws from the inside of the unit.
4- Secure ductwork to flanges per applicable codes.
É É É É É É É
É É É É É É É
72
72
É É É É É É É
(1829)
É É É É É É É
É É É É É É É
96
É É É É É É É É É
É É É É É É É É É
36
É É É É É É É É É
É É É É É É É É É
É É É É É É É É É
60
Page 6
CAUTION
Multiple Units - Vertical Airflow
96
72
60
60
96
Multiple Units - Horizontal Airflow
72
96 60
LGH/LCH420, 480, 540, 600