Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
Commissioning steps
Inspection steps
Maintenance steps
•
•
•
1. Removing the front panel.................................................................................................. 23
•
2. Filling the heating system................................................................................................. 23
•
3. Checking the power supply
•
4. Changing the language (if required)................................................................................. 25
•
•
5. Setting the time and date (if required).............................................................................. 25
•
6. Venting the boiler............................................................................................................... 25
•
7. Venting the heating system............................................................................................... 26
•
8. Filling the trap with water.................................................................................................. 26
•
9. Naming the heating circuits.............................................................................................. 26
•
•
•
10. Function sequence and possible faults........................................................................... 27
•
11. Adapting the burner to the altitude of the installation location .................................... 28
•
•
12. Checking the oil preheater installation position............................................................. 28
•
13. Cleaning the burner........................................................................................................... 29
•
14. Replacing the nozzle and checking or adjusting the ignition electrodes..................... 30
•
•
15. Checking the heat exchanger for contamination............................................................ 31
•
•
16. Cleaning the heat exchanger............................................................................................ 32
•
•
17. Checking the condensate drain and cleaning the trap................................................... 32
•
18. Checking the oil supply..................................................................................................... 33
•
•
19. Checking the vacuum in the oil line................................................................................. 33
•
•
20. Cleaning and replacing the oil pump filter, if required .................................................. 34
•
•
•
21. Checking and adjusting combustion quality................................................................... 34
•
•
22. Adjusting the standard burner settings........................................................................... 35
•
•
23. Checking the neutralising system (accessories)............................................................ 35
•
•
24. Checking the active charcoal filter (accessories)........................................................... 35
•
•
•
25. Checking the expansion vessel and system pressure
•
•
•
26. Checking all connections on the heating water side for leaks
•
•
•
27. Checking the flue system for unrestricted flow and tightness
•
•
•
28. Checking the burner (record values on page 107 of the report)
•
•
•
29. Checking the safety valve function
•
•
•
30. Checking the firm seating of electrical connections
•
31. Matching the control unit to the heating system ........................................................... 36
•
32. Adjusting the heating curves............................................................................................ 36
•
33. Linking the control unit to the LON.................................................................................. 38
•
34. Instructing the system user.............................................................................................. 39
•
35. Scanning and resetting the "Service" display................................................................. 39
•
•
36. Fitting the front panel........................................................................................................ 39
22
Page