Connecting Ac Power And Rps - Enterasys SecureStack B2 B2G124-48P Hardware Installation Manual

Poe gigabit and fast ethernet switches
Table of Contents

Advertisement

Figure 3-10

Connecting AC Power and RPS

Á
À
1 AC power cord
2 AC power connector
3.
Observe the power CPU LED (not shown) located on the front panel. During the 
initialization, the CPU LED will start by illuminating solid amber, then start blinking 
green, then blinking amber, then blinking green again until the end of the 
initialization, and then turns solid green. 
Note: If the CPU LED illuminates solid red, there was a critical failure. For more
information about the LED indications and troubleshooting, refer to
additional help, contact Enterasys Networks. Refer to
details
.
If the switch is a standalone unit, it will take approximately 30 seconds for the switch 
to start up. If the switch is a stack Manager, it can take up to 3 minutes or more to start 
up, depending on the number of Member switches in the stack.
Â
3 Connector for external redundant power supply
"Getting
SecureStack B2 Installation Guide 3-15
Connecting AC and PoE Power
Chapter
4. If you need
Help" on page 1-8 for