Commissioning, Inspec-Steps - Commissioning, Inspection And Maintenance - Viessmann Vitocrossal 200 Service Instructions For Contractors

Gas condensing boiler with matrix radiant burner permissible operating pressure 6 bar (0.6 mpa)
Hide thumbs Also See for Vitocrossal 200:
Table of Contents

Advertisement

Steps - commissioning, inspection and maintenance
Commissioning steps
Inspection steps
Maintenance steps
1. Checking the high limit safety cut-out setting................................................................
2. Filling the heating system with water and venting.........................................................
3. Filling the trap with water..................................................................................................
4. Commissioning the system...............................................................................................
5. Checking the motor-controlled flue gas damper (if installed)....................................... 11
6. Checking the gas type....................................................................................................... 11
7. Converting to natural gas LL............................................................................................ 11
8. Reducing the heating output (if required)........................................................................ 14
9. Checking static pressure and supply pressure.............................................................. 14
10. Checking the rotary damper setting................................................................................. 16
12. Checking the CO content.................................................................................................. 19
13. Checking the flue gas temperature.................................................................................. 20
14. Displaying the ionisation current..................................................................................... 20
15. Shutting down the system................................................................................................. 20
16. Opening the boiler door..................................................................................................... 20
17. Cleaning the combustion chamber and heating surfaces............................................. 21
18. Checking the gaskets and thermal insulation sections................................................. 21
tightness............................................................................................................................. 21
20. Cleaning the condensate drain pipe system and trap.................................................... 22
22. Checking the burner gauze assembly.............................................................................. 23
23. Checking the ignition electrodes and ionisation electrode........................................... 23
24. Cleaning the burner........................................................................................................... 24
25. Fitting the burner................................................................................................................ 24
26. Closing the boiler door...................................................................................................... 28
27. Checking the gas train valves for tightness.................................................................... 29
28. Checking the gas train filter element............................................................................... 29
29. Checking gas connections for tightness......................................................................... 30
30. Checking the gaskets on the flue gas side...................................................................... 30
31. Performing final checks..................................................................................................... 30
32. Checking the water quality................................................................................................ 31
used (DCC system)............................................................................................................ 31
35. Checking the expansion vessel ....................................................................................... 31
36. Checking the mixer for ease of operation and leaks...................................................... 31
content................................................................................................. 16
2
Commissioning, inspection, maintenance
Page
9
9
9
9
7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cm2b

Table of Contents