Commissioning, Inspec-Steps - Commissioning, Inspection And Maintenance - Viessmann Vitodens 222-F Installation Instructions For Contractors

Gas condensing storage combi boiler natural gas and lpg version
Table of Contents

Advertisement

Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
Commissioning steps
Inspection steps
Maintenance steps
1. Removing the front panels................................................................................................ 25
2. Filling the heating system................................................................................................. 25
3. Filling the DHW cylinder on the DHW side...................................................................... 26
4. Checking all connections on the heating water and DHW sides for leaks
5. Venting the boiler............................................................................................................... 27
6. Filling the trap with water.................................................................................................. 27
9. Venting the heating system............................................................................................... 28
10. Checking the gas type....................................................................................................... 29
11. Gas type conversion (only for operation with LPG)....................................................... 29
12. Checking the static pressure and supply pressure........................................................ 29
13. Function sequence and possible faults........................................................................... 31
14. Setting the heating output................................................................................................. 32
15. Tightness test on balanced flue system (annular gap test)........................................... 32
16. Removing the burner......................................................................................................... 33
17. Checking the burner gasket and burner gauze assembly.............................................. 34
19. Cleaning the heating surfaces.......................................................................................... 35
20. Checking the condensate drain and cleaning the trap................................................... 35
21. Installing the burner........................................................................................................... 37
23. Checking the anode connection....................................................................................... 37
24. Checking the anode earth current with an anode tester................................................ 38
25. Draining the boiler on the DHW side................................................................................ 39
26. Cleaning the DHW cylinder............................................................................................... 40
27. Checking and replacing the magnesium anode (if required)......................................... 40
28. Reassembling and filling the DHW cylinder.................................................................... 41
29. Checking the expansion vessel and system pressure................................................... 41
35. Checking the combustion quality..................................................................................... 43
36. Matching the control unit to the heating system............................................................ 44
37. Scanning and resetting the "Service" display................................................................. 44
38. Fitting the front panels...................................................................................................... 45
39. Instructing the system user.............................................................................................. 45
24
Page

Advertisement

Table of Contents
loading

This manual is also suitable for:

B2sb

Table of Contents