(Note to all Merchandisers)
Move the fi xture as close as possible to its permanent
location and then remove all packaging. Check for
damage before discarding packaging. Remove all
separately packed accessories such as kits and shelves.
Do NOT remove shipping braces until the
merchandisers are properly anchored to the floor.
Merchandisers are top heavy and could tip over
causing serious injury. Merchandisers must
be braced before removing the lag bolts.
Bag Rack Shipping Brace
On non-refrigerated cases, the shipping braces in the
middle should be removed. Its purpose is to protect the
bag rack during shipment.
Leveling
Merchandisers must be installed level to ensure proper
operation of the refrigeration system and to ensure
proper drainage of defrost water. Place prybar under
metal base and lift. DO NOT LIFT END PANEL. Turn
leveler, with supplied wrench, (one wrench per order)
clockwise to raise, counter clockwise to lower. Repeat
process with other levelers until case is level.
Merchandisers are of sectional construction which
means that two or more may be joined in line yielding
one long continuous display requiring only one pair of
ends. Joint kits and instructions are shipped separately.
Do NOT walk on top of merchandiser or damage to
the merchandiser and serious personal injury could
occur. They are not structurally designed to support
excessive external loading such as the weight of a
person.

6. Shipping Braces

NOTE:

7. Joining

8. Exterior Loading

6
To avoid removing concrete fl ooring, begin lineup
leveling from the highest point of the store.