Installation manual
MJPE multideck and SMD/SME Low Height Multideck
Operating Environment
Cases have been factory tested to AS1731, 25C at 60% RH. For best performance, store temperature should be
maintained at or below 24C at 50% RH, if not an "air ventilation kit" may be required.
To avoid condensation build-up, cases should be positioned to allow air to freely circulate around the underside and rear
of the case. Ideally, the floor will be level.
Cases must not be positioned in areas that may be subject to heat or air currents such as ventilation ducts, open doors or
windows, direct sunlight, electric fans or ovens, etc.
NOTE
Refer to product MSDS for all hazardous
substances used during installation in
relation to their application, PPE, first aid,
disposal and emergency management.
Refer page 20 (Risk Analysis)
For MSDS sheet contact your Hussmann
Representative
Handling and Transporting cases
Case dimensions can be found in the product engineering data sheets.
(This manual is a guide only. Always refer to the latest case information available from Hussmann Customer Service)
Always ensure that the moving device is of a suitable type, and has sufficient lifting capacity for the case weight and
dimension. Always lift cases from the underside.
Refer to and follow the manual handling policies of your Company when moving cases.
CAUTION
Care must be taken to avoid damage to drainage
outlets and electrical equipment mounted under or
at the rear of cases.
Shipping Damage and Shortages
If possible, it is recommended that packaging be removed from the cases before they are moved into the store.
After removing packaging, inspect the case for any shipping damage and ensure that all case inclusions, such as trims
etc are accounted for. Immediately report any shipping damage to the carrier and inform Hussmann Customer Service of
any short supplies.
________________________________________________________________________________________________________________________
Page 4
Hussmann