A. Measurement steps (from Figure 68).
1
Phase A to Phase C
2
Phase A to Phase B
3
Phase B to Phase C
4
Phase A to Ground
5
Phase B to Ground
6
Phase C to Ground
22. Resistance should be equal and none should be
grounded.
A. If this fails, replace the blower assembly.
B. If it passes, replace the control module.
FIGURE 68
DEC Star Motor Plug Testing
Manual 2100-694B
Page
59 of 62