CHYHBH05+08AF + EHYKOMB33A
Daikin Altherma R Hybrid
4P471761-1E – 2020.10
2 Remove the top plate from the indoor unit.
3 The bracket to mount the boiler on the heat pump module is already mounted
to the backside of the gas boiler.
4 Lift the boiler. One person lifts the gas boiler on the left side (left hand on the
top and right hand on the bottom) and another person lifts the gas boiler on
the right side (left hand on the bottom and right hand on the top).
5 Tilt the top of the unit at the position of the indoor unit mounting bracket.
6 Slide the boiler downwards to fix the boiler bracket onto the indoor unit
mounting bracket.
36kg
7
Installation
|
Installer reference guide
55